- Overview
- Related Products
We provide steel forging and hight precision machining custom-made parts service.
Forging machine from 63 tons to 500 tons can produce parts from 20g to 2500g
Forging tolerance +/-0.05mm
Over 100 sets of cnc lathe with MAX OD 120mm, Min tolerance +/-0.01mm
OEM steel forging adapter
Brass forging adapter
Aluminum forging adaptor
Cixi Weiyue Metal product Co., Ltd. Formely known asCixi Fule Flooding Equipment Co., Ltd.
set up in the year of 2001, is one of the manufacturing factory main provide customization metal die-casting, forging, cold or warm form pressing, stamping and precision CNC lathe machining service, We have a complete in-house manufacturing system-from products design, making, testing to parts mass-production.
Our factory have been approved by ISO9001:2015 supervisory system, all our workshop and products are manufactured under it. Main processes workshop include precision forging and stamping workshop, cold/ward forming press workshop, CNC lathe machining workshop, and inspection and packing workshop.
OEM/ODM Service |
According to customers prints, drawings, specifications or samples |
Production range |
auto parts, industrial metal parts, machine fitting and hardware parts |
Available materials |
steel alloy, brass, aluminum/zinc alloy, iron and stainless steel |
Manufacturing process |
· Hot forging + machining · Warm/cold compressing + machining · Sheet stamping + machining · Bar stock + cnc machining · Braiding (stainless steel wire) |
Available production processes |
Annealing, heat treatment, sand-blasting, surface plating, polish, QC testing and packing |
Available finishes |
fine polished, chrome, zinc, nickel plating, anodize with all kinds of customized colors, etc. |
Target customer |
Direct manufacturers, EAU purchase amount from $0.2 million to 2 million. |
Delivery time |
2-6 weeks for samples, 4-8 weeks for mass-production delivery |
OUR TEAM
|
||
Department |
Number of employees |
Years of work in this field |
General Manager |
1 |
16 |
Vice-general Manager |
1 |
12 |
Finance Dept. |
3 |
5-10 |
Purchase Dept. |
2 |
5-10 |
Technology Dept. |
3 |
8-16 |
Sales Dept. |
3 |
8-12 |
QC Dept. |
6 |
3-12 |
Production Dept |
52-62 |
1-12 |
FAQ:
Q1.What is your main products?
A1:Our main products are hot or cold forging parts, stamping parts and cnc machining parts. The main available material are brass, steel, aluminum and stainless steel.
Q2. How to ensure that every process's quality?
A2:Every process will be checked by our quality inspection department which insures every product's quality.
Q3.How long is your delivery time?
A3:Our delivery time is generally 35 to 45 days. Or according to the quantity.
Q4. What is your payment method?
A4:30% value of T/T in advance and other 70% balance on B/L copy.
For small order less than 1000USD, would suggest you pay 100% in advance to reduce the bank charges.
Q5.Can you provide a sample?
A5:Sure, Our sample is provided after receiving the tooling cost and courier fees.